Missing image KingsCrossDevelopmentModel.jpg Model showing the current redevelopment of the King's Cross area with the Channel Tunnel Rail Link terminal behind the barrel vaulted St Pancras Station on the left. The Channel Tunnel Rail Link (or CTRL) is a project to construct a 108 km high-speed rail line from London to the British end of the Channel Tunnel. When it is completed in 2007, it will be possible to reach Paris from St Pancras in 2hrs 15mins and Brussels in 2hrs.
BackgroundA high-speed rail track has been in operation on the French and Belgian sections of the Eurostar rail link since the Channel Tunnel's opening, carrying trains at 300km/h. In Britain, trains have had to share existing standard track with local traffic, limiting average speeds to 100km/h. In addition, the generally poor state of Britain's rail infrastructure has caused frequent and unpredictable delays, reducing the appeal of the Eurostar service. The projectSection 1 of the CTRL, a 74km section of high-speed track from the Channel Tunnel to Fawkham Junction in north Kent, was opened in September 2003. This cut the London-Paris journey time by around 20 minutes, to 2hrs 35mins. The section includes a 1.2km bridge over the River Medway and 3.2km-long, 12m-diameter tunnel through the North Downs. In safety testing on the section prior to opening, a new UK rail speed record of 334.7km/h was set. Trains continue to use existing suburban lines to enter London, and terminate at Waterloo station, on the south side of central London. Section 2 of the project, due to open in 2007, is a 34km stretch of track from Ebbsfleet (near Northfleet) to London St Pancras. It includes two new stations (at Ebbsfleet and London Stratford), a 3km tunnel under the Thames near Dartford, and a 19km twin tunnel running into central London. When the second phase of the CTRL is opened, all Eurostar trains will run to St Pancras International instead of Waterloo. Engineering notes
Additional informationAfter local protests, early plans were modified to put much more of the track in tunnel where it nears St Pancras. For example, the Link will now pass underneath, rather than along with, the North London Line, before running into St Pancras still in tunnel, rather than the previously-expected elevated section. The CTRL building works are causing considerable disruption, but bringing in their wake much redevelopment of the run-down area of post-industrial and ex-railway land close to King's Cross and St Pancras. The project is due to be completed in 2007. See alsoExternal links
|
|||||||
|
|
|
|
|
|
Copyright 2008 WordIQ.com - Privacy Policy
::
Terms of Use
:: Contact Us
:: About Us This article is licensed under the GNU Free Documentation License. It uses material from the Wikipedia article "Channel Tunnel Rail Link". |