Sengkang Light Rapid Transit The Sengkang Light Rapid Transit is a 10.7 km light rail line which partly opened on 18 January 2003. It is fully automated. The rolling stock is supplied by Mitsubishi Heavy Industries. It is currently operated by SBS Transit.
History
Stations
- STC / NE16: Sengkang (interchange with North East MRT Line)
- East Loop
- SE1: Compassvale
- SE2: Rumbia
- SE3: Bakau
- SE4: Kangkar
- SE5: Ranggung
- West Loop
- SW1: Cheng Lim (not open)
- SW2: Farmway (not open)
- SW3: Kupang (not open)
- SW4: Thanggam
- SW5: Fernvale
- SW6: Layar
- SW7: Tongkang
- SW8: Renjong
External links
|