Thames Barrier - Definition and Overview

Related Words: Balustrade, Bank, Bar, Barbican, Bastion, Battlement, Block, Blockade, Bolt, Boom, Bottleneck

The Thames Barrier is a flood control structure on the River Thames at Woolwich Reach in London. It is the world's largest movable flood barrier.

River Thames Flood Barrier
Enlarge
River Thames Flood Barrier

Built across a 523 m stretch of the river the barrier divides the river into six channels between nine large concrete piers. The flood gates across the openings are radial - they operate by rotating, rising by hydraulics out of a horizontal sill below the water to form the barrier, they can rotate further to allow for 'underspill' or maintenance. The four large central gates are made of steel and are each 61 metres long, 10.5 metres high and weigh 1,500 tonnes.

London is vulnerable to flooding. The threat has increased over time due to the slow but continuous rise in high water level over the centuries (75 cm / 100 years) and the slow 'tilting' of Britain (up in the north and down in the south) caused by post-glacial rebound. This general rise in potential water levels combined with the tidal conditions of the Thames and with particularly severe weather conditions can create serious flood conditions - surge tides. After 307 people died in the UK in the North Sea Flood of 1953 the issue gained new prominence. Early proposals for a flood control system were stymied by the need for a large opening in the barrier to allow for vessels from London Docks to pass through. When containerization came in and a new port was opened at Tilbury a smaller barrier became feasible.

The barrier was designed by Rendel, Palmer and Tritton for the GLC, the concept of the rotating gates was devised by Charles Draper. The site at Woolwich was chosen because of the relative straightness of the banks, and because the underlying river rock was strong enough to support the barrier. Work began at the barrier site in 1974 and construction was largely complete by 1982. In addition to the barrier itself the flood defences for 11 miles down river were raised and strengthened. The barrier was officially opened on May 8, 1984. Total construction cost was around £500 m with an additional £100 m for river defenses. The barrier was designed to cope with sea level rises until around 2030. Based on current estimates, it is expected to serve its full term. Since 1982 the barrier has been raised over 70 times; further, it is always raised every month for testing. The barrier was operated by the National Rivers Authority until April 1996 when it passed to the Environment Agency.

External link

Example Usage of Barrier

suspect22: well done! good going! RT @MuscleNerd http://twitpic.com/rfql7 - Just did my first 2 dives at Great Barrier Reef
bradt: Just uploaded all my Great Barrier Reef diving photos and two videos. Sea turtle swimming video: http://bit.ly/8lCw1O
brototyp: @threepwood Der Muskelmensch heißt übrigens Eric: http://twitpic.com/rfql7 - Just did my first 2 dives at Great Barrier Reef via @musclenerd
Copyright 2009 WordIQ.com - Privacy Policy  :: Terms of Use  :: Contact Us  :: About Us
This article is licensed under the GNU Free Documentation License. It uses material from the this Wikipedia article.